Friday, December 24, 2010
process gallery
For our final presentation, a gallery was assembled of our process work. Our visiting professor, Coleman Coker, directed a unique approach, asking us to begin the semester at the site, observing, recording, and abstracting the surrounding patterns of organization in an effort to prepare ourselves for working within what are invariably dynamic, interconnected systems. Only after such exercises did we develop a program or begin designing any object.
Wednesday, December 22, 2010
finishing
Working on site, applying recycled polycarbonate skin...
...into the night...
Installing the recycled flooring involved getting very muddy for a couple of us.
Horizon framed just as planned...
We encountered a minor setback when a snow and wind storm came out of nowhere, scattering some materials and covering the structure in snow. It wasn't clear whether we'd meet our presentation deadline the next day.
Tuesday, December 21, 2010
the move
With only minor parts and cladding to go, it was time to relocate the structure to its final site. We began by winching it out to be loaded on a trailer.
The trailer was backed up, and the structure was winched onto it.
Once the structure was on the trailer and secure, we had several blocks to travel to the building site. Transporting on a Sunday night ensured minimal traffic issues.
Arriving on site...
The next morning - time to install the floor, roof, and skin!
the "thin wall" and changes
We first fabricated the structural steel for what was named the "thin wall" in two pieces, inside on the shop floor. We then manually placed it on the floor structure, securing and plumbing it with clamps and dimensional lumber as shown above. The erection of this wall felt like a milestone for the group as we began to realize that we may indeed complete the project on time.
Our confidence was further bolstered by the installation of the wood slat infill for the wall. the wood slats are made of wood salvaged from campus trees that were removed to make way for new construction.
This picture shows the completed "thin wall" with one of it's two benches already installed. at this time in the construction, the material qualities of the project were becoming evident.
As all of the main pieces were erected, some necessary changes became apparent. First, we found that the pitch of the roof we had planned would need to adjust to allow for drainage through the "thick wall." at first, this felt like a significant setback, but we made fast decisions, cutting and re-welding steel members to solve the problem with surprising efficiency.
We added an unanticipated piece of steel at the recommendation of our volunteer structural engineer, Jerry Stevens, to gain some rigidity in our moment frame. A student is pictured above removing the newly added steel member upon the discovery of a conflict with the designed roof scupper. The member was reattached in an adjusted location.
Wednesday, December 8, 2010
Thursday, December 2, 2010
renderings
Below are some renderings of the project we are building. None of them are totally accurate anymore, but all are fairly close and give a good idea of how this design should look as it comes together.
progress
The steel frame is now outdoors, and pieces of the wall have been placed on it. The peices for the thin wall have been fabricated, and await assembly. More recent photographs will be posted soon.
The class carries the biggest portion of our thick wall.
The class carries the biggest portion of our thick wall.
The structural steel frame has almost been completed, and we're relishing the welding experience.
Three students take a break upon completion of the seating alcove.